|
Eco Office
This sustainable office
design will achieve BREAAM excellent accreditation and is intended
for a green field site. The building has been designed to have
minimum impact on the site with the unit hovering above the ground
to have minimum ecological intervention.
Being prefabricated off site
and positioned on to a series of pile foundations the construction
period for these offices is less than two weeks.
Individually the offices can
accommodate up to ten members of staff but are flexible enough in
design to allow them to be joined with up to 4 units. The joining of
the units can take a number of formations in a variety of forms,
providing interest to any possible site either rural or urban.
<<back to projects
|